Designed for continuous drawer assembly, final inspection, and warehouse integration

The low voltage switchgear drawer assembly line adopts a double-speed chain conveyor system for production. Each drawer moves through continuous assembly operations from enclosure installation to final completion.

Workstations are divided according to the standard process of each operation to achieve balanced production rhythm across the line. After final inspection, the finished drawers can be integrated with an automated warehouse system, with barcode scanning used for storage and retrieval management.

Specifications
Model KD-LCT-20-50
Number of Workstations 20 sets
Number of Work Pallets 30 pieces
Conveyor Type Free flow conveyor (two layer 2.5 times)
Work Pallet Return System Automatic Return (up/down recycle)
Testing Area (L×W) 4000×4000mm
Line Footprint (L×W) 20000×4000mm