Climbing Scaffolding

Climbing Scaffolding
Request a Quote
» Related Picture

Hydraulic Climbing Anchored Climbing Scaffolding: Climbing Scaffolding

Description of Hydraulic Climbing Anchored Climbing Scaffolding: Climbing Scaffolding
Shenxi YHJM100 range of climbing scaffoldings are produced on the basis of suspended access equipment. They mainly comprise attachment devices, directive track, central frames, hydraulic pressure power drive systems, anti-tilt, fall arrest systems and other safety systems. They do play a vital role in the various work of high-rise buildings and soaring towers, bridges, dams, etc.

Key Features and Advantages of Hydraulic Climbing Anchored Climbing Scaffolding: Climbing Scaffolding
-well-designed and balanced structure, made of rigid steel
-powered by hydraulic pressure, more stable and safer than the traditional electricity-powered ones
-able to carry wall molding boards on it and cleaning work for it can be done on the scaffolding
-easy and fast to assemble and disassemble as a whole, no need to install extra platforms.
-it can reduce the construction time, 1.5 days saved per story
-coordinated personnel can be saved up to 3-5, while 18-22 needed for the ordinary climbing scaffoldings, and the hoisting times can be reduced by 40%
-advanced anti-tilt and fall arrest equipment installed to completely secure the safety in operation
-multi-storied platforms are available to substantially save the project term.
-excellent formwork positioning system able to improve the concrete construction quality of external wall
-highly automated climbing systems, easy to handle, stable and safe while in operation

Technical Parameters of Hydraulic Climbing Anchored Climbing Scaffolding: Climbing Scaffolding
Span of the whole frame ≤6m
Frame height 3-5 decks
Frame width 0.8~2.25m
Movable distance of the board-mounted trolley 0~600mm
Footstep 1.8 m ~3.0m
Steps needed 4~11 steps
Working deck and permissible capacity The third deck≤3kN/m2 , the second≤2kN/m2(hydraulic climbing scaffolding)
The top deck≤1.5kN/m2、the middle deck≤3kN/m2
The bottom deck≤1.0kN/m2(hydraulic climbing scaffolding)
Thrust of hydraulic cylinder(single cylinder) 50kN 100kN
Lift speed 500mm/min~550mm/min
Related products
Send Message
Other Products
Inquiry
Inquiry