Custom Pile Driving Equipment for Your Construction Project
Request a Quote
Volvo 480 Excavator Bridge Construction Piling Equipment for Steel Pipe Piling
Project time: 2014
Project site: Shixiang Road, Hangzhou
Our customer was constructing a 200m steel bridge that required a steel pipe pile with a diameter of 1.2m and a length of 30m for bridge support. They purchased a set of vibratory hammers used to support a Volvo 480 excavator. According to customer requirements, construction requirements, excavator brand, and excavator type, we provided a J450 vibratory hammer.
Model | J450 |
Frequency(r/min) | 2600 |
Centrifugal force(KN) | 55 |
Operating pressure(Bar) | 350 |
Flow(L) | 280 |
Dimensions(mm) | 1420*800*2420 |
Weight(Kg) | 2300 |
Hydraulic excavator base machine(t) | 42-45 |
Related products
Send Message
Other Products
Most Recent
More
Other Products
Videos