Fully Automatic Reinforcing Mesh Production Line I

Fully Automatic Reinforcing Mesh Production Line I
Fully Automatic Reinforcing Mesh Production Line I
Fully Automatic Reinforcing Mesh Production Line I
Fully Automatic Reinforcing Mesh Production Line I
Fully Automatic Reinforcing Mesh Production Line I
Fully Automatic Reinforcing Mesh Production Line I
Fully Automatic Reinforcing Mesh Production Line I
Fully Automatic Reinforcing Mesh Production Line I
Fully Automatic Reinforcing Mesh Production Line I
Fully Automatic Reinforcing Mesh Production Line I
Fully Automatic Reinforcing Mesh Production Line I
Fully Automatic Reinforcing Mesh Production Line I
Request a Quote

Reinforcement Mesh Machine / Automatic Mesh Equipment / Wire Mesh Machine

Features of the Fully Automatic Reinforcing Mesh Production Line I
1. Both line and cross wires are fed from pre-cut wires. Line wires are fed automatically while cross wires are added and distributed automatically from the hopper. A servo motor moves the mesh through the machine.

2. The welding electrodes and transformers are equipped with a water-cooling system to prolong the service life of the wire mesh machine.

3. The welding system is synchronously controlled and the welding transformers can work simultaneously or separately.

4. The main structure of welding machine is motor driven and spring weighted to minimize operating costs.

5. Welding materials include, hot-rolled ribbed bar, cold-rolled ribbed bar, hot-rolled plain bar, cold-rolled plain bar, etc.

6. Can be equipped with turnover, dropping and automatic packaging devices.

Technological processes of the Fully Automatic Reinforcing Mesh Production Line I Technical Parameters of Fully Automatic Reinforcing Mesh Production Line I
Model GWCD2500 (3-8) GWCD2500 (5-12) GWCD3300 (5-12)
Quantity of welding spot 48 24 32
Width of mesh ≤2500 mm ≤2500 mm ≤3300 mm
Wire diameter 3-8 mm 5-12 mm 5-12 mm
Length of mesh ≥1 m ≥1 m ≥1 m
Transverse bar spacing ≥50mm ≥75 mm ≥75 mm
Longitudinal bar spacing 50-200 mm 100-300 mm 100-300 mm
Min. power 200KVA 200KVA 200KVA
Optimal power 800 KVA 1600 KVA 2000 KVA
Welding speed 40-60t/min 60-80t/min 60-80t/min
Control system PLC PLC PLC

Applications
The mesh produced by these production lines are used in engineering projects such as the construction of high-rises, bridges, highways, tunnels, etc.

Related products
Send Message
Other Products
Inquiry
Inquiry