Bus Assembly Line Case Study
Request a Quote
This is an assembly line JDSK provided for a coach manufacturer in Guangxi. The following is the bus final assembly line’s basic information.
Item | Specification |
Conveyor form | Slat conveyor |
Operation mode | Stepping operation |
Assembling interval | 1-120min adjustable |
Number of the work stations | 12 |
Spacing of the work stations | 14m |
Total length of the conveying line | 169m |
Effective width of the conveying line | 700mm |
Height of the conveying line | |
Pitch of the conveying chains | 315mm |
Pitch diameter of drag chain sprockets | |
Operating speed | 2-8m/min |
Drive power | 16KW |
Start and stop mode | Soft start and soft stop |
Item | Specification |
Length(mm) | 74000 |
Width(mm) | 2100 |
Operation mode | Stepping operation |
Spacing of the work stations(mm) | 9500 |
Item | Specification |
Total length(m) | 112 |
Spacing of the work stations(mm) | 9500 |
Effective number of the work stations | 4 |
Related products
Send Message
Other Products
Most Recent
More
Other Products
Videos